Project Name : | Rehalibation / Strengthening of Br. No.1 art KM. 0.79 (From Sealdah) Existing Clear Span 1 x 33.53 M, Span Through Type +1 x 8.38 M.Semi Through Girder Proposed Span (c/c of Bearing) 1 x 25.6 M + 1 x 8.9 M + 1.8.6 M |
Period of Fabrication :
|
04/06/2007 to 19/03/2008 |
Nature of Service :
|
Consultancy Services in Conection with Design & Drawings of Walkway Girders & False Work |
Span (M) :
|
|
Weight (MT)
|
|
Consultancy Provided to :
|
GPT Infrastructure Pvt. Ltd. |
Executing Agency :
|
GPT Infrastructure Pvt. Ltd. |
Client :
|
Eastern Railway |
Status of Job :
|
Fabrication, Erection & Commissioning Completed yet Commissioning Not Completed. |